Wednesday, 23 November 2022

Why Civil Engineers Prefer Ready-Mix Concrete Over Site-Mixed Concrete in D-Wall Construction

Ready-Mix Concrete

Before the foundation comes the right materials, hence most diaphragm wall construction companies pay high attention to the kind of concrete and slurry used in the construction process. With the right quality and quantity of materials, any construction can stand the test of time. One such vital material of the construction world is concrete, constituting refined and coarse aggregates mixed in a fixed quantity and water.

Though, selecting the right type of concrete is highly essential for any project as it can affect its strength, construction cost and time. This is why diaphragm wall contractors in India prefer using Ready-Mix Concrete (RMC) over Site-Mixed Concrete (SMC) for all deep basement underground construction.

RMC Plant

Ready-Mixed Concrete as its name connotes is a tailor-made concrete, manufactured in a plant and delivered to the site in a ready-to-use state. Depending on the specification of the construction project, RMC can be delivered in the plastic state (similar to the concrete dough) in a barrel truck or in the dry state to be mixed on the site itself.

On the other hand, the concrete mix prepared on-site is known as Site-Mixed Concrete. There are various components involved in the preparation of SMC in specific ratios to obtain the desired strength and consistency. Hence it needs to be done under the eye of an expert.

RMC for Diaphragm Wall Construction

RMC for Diaphragm Wall Construction

Talking specifically about diaphragm wall construction, RMC with cement, sand, 10MM and 20MM aggregate, ad mixer, and potable water works most efficiently. The minimum cement content should range around 330 to 400 kg per cubic meter. It is vital to note that for any high water table or underwater project like diaphragm wall construction for dams, the cement content increases by 10%.

The RMC’s retention time is around 2.5 to 3 hours and can be maintained by using admixtures. To reach optimum workability it is advisable to maintain the slump around 170-190m. The top diaphragm wall contractors in India, suggest that the minimum grading should be M25 and M15 for a diaphragm wall and guide wall respectively.

Continue reading

Friday, 17 June 2022

Anchoring: A Key Aspect Diaphragm Wall Construction

Anchoring

Diaphragm wall construction is very crucial for modern super structures like residential and commercial complexes with basements. These reinforced concrete walls provide the much required underground support and stability to the structure. And what ensures that these diaphragm walls are sturdy enough to keep these structures intact is Anchoring. All diaphragm wall construction companies will unanimously agree that Anchoring is one of the most important aspects of diaphragm wall construction. Here’s why…

What exactly is Anchoring a diaphragm wall?

In diaphragm wall construction, ground anchor bolts are used in order to link the structural and non-structural elements of the D-wall to the concrete. The process of casting these anchors into the diaphragm wall is known as Anchoring. The Anchoring activity begins 7 days after the diaphragm wall panels are cast.

How does Anchoring help in the diaphragm wall construction?

Anchoring assists in transferring the tension and shear forces between these structural elements and lateral support to the diaphragm wall to sustain force from the top. It involves anchor bolts, steel plates, sleeves and stiffeners to form the anchor on the diaphragm wall.

If anchoring is not done by diaphragm wall construction companies, then they have to increase the depth of the wall into the ground to almost double the size required. For instance, if the requirement is to construct a basement of 10 ft., the diaphragm wall must go deeper into the ground by 10 ft. more, in order to ensure it doesn’t collapse. Constructing a diaphragm wall without anchoring increases the cost of labor, the amount of concrete and steel used in the process, thus adding to the cost of the project.

What are the anchors used in Anchoring?

The tool used in the process of anchoring is called a Grouted Ground Anchor. There are three important elements you’ll see in an anchor, and they are Steel Tendons, Spacers and End Cone. Top civil engineering companies in India like Heritage Infraspace Pvt Ltd used steel tendon grouted ground anchors manufactured by Tata or Usha Martin.

This is the breakdown of an Anchor that goes into the diaphragm wall

Anchor diaphragm wall

Now, these steel tendons are generally 12.7 MM wide and come in 7 ply form (7 different wires coming together to form one single tendon). The spacers, just like its name, create spaces between these wires to ensure that they do not touch each other and that the cement flowing into the sleeve of the anchor is regulated.

The End Cone, is a conical shaped protector attached on the interior end of the anchor, which protects the wires from touching the soil base.

The Anchoring process

Anchoring is done post casting of the diaphragm wall. There are multiple levels of anchoring, with one anchor level in every basement. When the diaphragm wall cages are made, there are slots left open in equal distance on them. They are called anchoring sleeves. The distance maintained between them is ideally 5 meters. But the depth can be increased, given the quality of the soil the diaphragm wall construction companies are dealing with.

Continue reading

HIPL X L&T: A Journey of Pace & Modernity

Built by the top civil construction companies in India , modern superstructures depend on sophisticated and calculated geotechnical solutio...